Assessing uncertainties in flood forecasts for decision making: Prototype of an operational flood management system integrating ensemble predictions

Publikation: Beitrag in FachzeitschriftArtikelForschungPeer-Review

Autoren

  • J. Dietrich
  • A. H. Schumann
  • M. Redetzky
  • J. Walther
  • M. Denhard
  • Y. Wang
  • B. Pfützner
  • U. Büttner

Externe Organisationen

  • Ruhr-Universität Bochum
  • DHI WASY GmbH
  • Deutscher Wetterdienst (DWD)
  • Büro für Angewandte Hydrologie
  • Landesamt für Umwelt, Landwirtschaft und Geologie (LfULG)
Forschungs-netzwerk anzeigen

Details

OriginalspracheEnglisch
Seiten (von - bis)1529-1540
Seitenumfang12
FachzeitschriftNatural Hazards and Earth System Science
Jahrgang9
Ausgabenummer4
PublikationsstatusVeröffentlicht - 31 Aug. 2009
Extern publiziertJa

Abstract

Ensemble forecasts aim at framing the uncertainties of the potential future development of the hydrometeorological situation. A probabilistic evaluation can be used to communicate forecast uncertainty to decision makers. Here an operational system for ensemble based flood forecasting is presented, which combines forecasts from the European COSMO-LEPS, SRNWP-PEPS and COSMO-DE prediction systems. A multi-model lagged average superensemble is generated by recombining members from different runs of these meteorological forecast systems. A subset of the super-ensemble is selected based on a priori model weights, which are obtained from ensemble calibration. Flood forecasts are simulated by the conceptual rainfall-runoff-model ArcEGMO. Parameter uncertainty of the model is represented by a parameter ensemble, which is a priori generated from a comprehensive uncertainty analysis during model calibration. The use of a computationally efficient hydrological model within a flood management system allows us to compute the hydro-meteorological model chain for all members of the sub-ensemble. The model chain is not re-computed before new ensemble forecasts are available, but the probabilistic assessment of the output is updated when new information from deterministic short range forecasts or from assimilation of measured data becomes available. For hydraulic modelling, with the desired result of a probabilistic inundation map with high spatial resolution, a replacement model can help to overcome computational limitations. A prototype of the developed framework has been applied for a case study in the Mulde river basin. However these techniques, in particular the probabilistic assessment and the derivation of decision rules are still in their infancy. Further research is necessary and promising.

ASJC Scopus Sachgebiete

Zitieren

Assessing uncertainties in flood forecasts for decision making: Prototype of an operational flood management system integrating ensemble predictions. / Dietrich, J.; Schumann, A. H.; Redetzky, M. et al.
in: Natural Hazards and Earth System Science, Jahrgang 9, Nr. 4, 31.08.2009, S. 1529-1540.

Publikation: Beitrag in FachzeitschriftArtikelForschungPeer-Review

Download
@article{81e58ecd77784794930bb5bdcb274493,
title = "Assessing uncertainties in flood forecasts for decision making: Prototype of an operational flood management system integrating ensemble predictions",
abstract = "Ensemble forecasts aim at framing the uncertainties of the potential future development of the hydrometeorological situation. A probabilistic evaluation can be used to communicate forecast uncertainty to decision makers. Here an operational system for ensemble based flood forecasting is presented, which combines forecasts from the European COSMO-LEPS, SRNWP-PEPS and COSMO-DE prediction systems. A multi-model lagged average superensemble is generated by recombining members from different runs of these meteorological forecast systems. A subset of the super-ensemble is selected based on a priori model weights, which are obtained from ensemble calibration. Flood forecasts are simulated by the conceptual rainfall-runoff-model ArcEGMO. Parameter uncertainty of the model is represented by a parameter ensemble, which is a priori generated from a comprehensive uncertainty analysis during model calibration. The use of a computationally efficient hydrological model within a flood management system allows us to compute the hydro-meteorological model chain for all members of the sub-ensemble. The model chain is not re-computed before new ensemble forecasts are available, but the probabilistic assessment of the output is updated when new information from deterministic short range forecasts or from assimilation of measured data becomes available. For hydraulic modelling, with the desired result of a probabilistic inundation map with high spatial resolution, a replacement model can help to overcome computational limitations. A prototype of the developed framework has been applied for a case study in the Mulde river basin. However these techniques, in particular the probabilistic assessment and the derivation of decision rules are still in their infancy. Further research is necessary and promising.",
author = "J. Dietrich and Schumann, {A. H.} and M. Redetzky and J. Walther and M. Denhard and Y. Wang and B. Pf{\"u}tzner and U. B{\"u}ttner",
year = "2009",
month = aug,
day = "31",
doi = "10.5194/nhess-9-1529-2009",
language = "English",
volume = "9",
pages = "1529--1540",
journal = "Natural Hazards and Earth System Science",
issn = "1561-8633",
publisher = "European Geosciences Union",
number = "4",

}

Download

TY - JOUR

T1 - Assessing uncertainties in flood forecasts for decision making

T2 - Prototype of an operational flood management system integrating ensemble predictions

AU - Dietrich, J.

AU - Schumann, A. H.

AU - Redetzky, M.

AU - Walther, J.

AU - Denhard, M.

AU - Wang, Y.

AU - Pfützner, B.

AU - Büttner, U.

PY - 2009/8/31

Y1 - 2009/8/31

N2 - Ensemble forecasts aim at framing the uncertainties of the potential future development of the hydrometeorological situation. A probabilistic evaluation can be used to communicate forecast uncertainty to decision makers. Here an operational system for ensemble based flood forecasting is presented, which combines forecasts from the European COSMO-LEPS, SRNWP-PEPS and COSMO-DE prediction systems. A multi-model lagged average superensemble is generated by recombining members from different runs of these meteorological forecast systems. A subset of the super-ensemble is selected based on a priori model weights, which are obtained from ensemble calibration. Flood forecasts are simulated by the conceptual rainfall-runoff-model ArcEGMO. Parameter uncertainty of the model is represented by a parameter ensemble, which is a priori generated from a comprehensive uncertainty analysis during model calibration. The use of a computationally efficient hydrological model within a flood management system allows us to compute the hydro-meteorological model chain for all members of the sub-ensemble. The model chain is not re-computed before new ensemble forecasts are available, but the probabilistic assessment of the output is updated when new information from deterministic short range forecasts or from assimilation of measured data becomes available. For hydraulic modelling, with the desired result of a probabilistic inundation map with high spatial resolution, a replacement model can help to overcome computational limitations. A prototype of the developed framework has been applied for a case study in the Mulde river basin. However these techniques, in particular the probabilistic assessment and the derivation of decision rules are still in their infancy. Further research is necessary and promising.

AB - Ensemble forecasts aim at framing the uncertainties of the potential future development of the hydrometeorological situation. A probabilistic evaluation can be used to communicate forecast uncertainty to decision makers. Here an operational system for ensemble based flood forecasting is presented, which combines forecasts from the European COSMO-LEPS, SRNWP-PEPS and COSMO-DE prediction systems. A multi-model lagged average superensemble is generated by recombining members from different runs of these meteorological forecast systems. A subset of the super-ensemble is selected based on a priori model weights, which are obtained from ensemble calibration. Flood forecasts are simulated by the conceptual rainfall-runoff-model ArcEGMO. Parameter uncertainty of the model is represented by a parameter ensemble, which is a priori generated from a comprehensive uncertainty analysis during model calibration. The use of a computationally efficient hydrological model within a flood management system allows us to compute the hydro-meteorological model chain for all members of the sub-ensemble. The model chain is not re-computed before new ensemble forecasts are available, but the probabilistic assessment of the output is updated when new information from deterministic short range forecasts or from assimilation of measured data becomes available. For hydraulic modelling, with the desired result of a probabilistic inundation map with high spatial resolution, a replacement model can help to overcome computational limitations. A prototype of the developed framework has been applied for a case study in the Mulde river basin. However these techniques, in particular the probabilistic assessment and the derivation of decision rules are still in their infancy. Further research is necessary and promising.

UR - http://www.scopus.com/inward/record.url?scp=76149088451&partnerID=8YFLogxK

U2 - 10.5194/nhess-9-1529-2009

DO - 10.5194/nhess-9-1529-2009

M3 - Article

AN - SCOPUS:76149088451

VL - 9

SP - 1529

EP - 1540

JO - Natural Hazards and Earth System Science

JF - Natural Hazards and Earth System Science

SN - 1561-8633

IS - 4

ER -

Von denselben Autoren