Ansätze zur Ermittlung und Reduktion nichtproduktiver Zeiten an Tiefbohranlagen

Publikation: Beitrag in FachzeitschriftArtikelForschungPeer-Review

Autoren

  • Florian Bär
  • Catalin Teodoriu
  • Ludger Overmeyer

Externe Organisationen

  • Technische Universität Clausthal
Forschungs-netzwerk anzeigen

Details

Titel in ÜbersetzungApproaches for determination and reduction of non-productive times of drilling rigs for deep wells
OriginalspracheDeutsch
FachzeitschriftLogistics Journal
Jahrgang2013
PublikationsstatusVeröffentlicht - 2013

Abstract

Because of the high drilling costs an economic power production of deep geothermal energy is currently elusive. Since the production costs of deep wells depend directly on the production time, the non-productive processes require an intensive optimization. Primarily, processes which lead to an interruption of the drilling process will be analyzed and optimized. These processes are mainly the transport of the pipes between rack and working platform as well as the connection process of the pipes. In context of this paper, approaches to redesign the processes and motion sequences for a deep drilling rig are developed and their time savings are investigated.

Schlagwörter

    Deep geothermal energy, Drilling rig, Non-productive processes, Time saving

ASJC Scopus Sachgebiete

Zitieren

Ansätze zur Ermittlung und Reduktion nichtproduktiver Zeiten an Tiefbohranlagen. / Bär, Florian; Teodoriu, Catalin; Overmeyer, Ludger.
in: Logistics Journal, Jahrgang 2013, 2013.

Publikation: Beitrag in FachzeitschriftArtikelForschungPeer-Review

Bär F, Teodoriu C, Overmeyer L. Ansätze zur Ermittlung und Reduktion nichtproduktiver Zeiten an Tiefbohranlagen. Logistics Journal. 2013;2013. doi: 10.2195/lj_Proc_baer_de_201310_01
Bär, Florian ; Teodoriu, Catalin ; Overmeyer, Ludger. / Ansätze zur Ermittlung und Reduktion nichtproduktiver Zeiten an Tiefbohranlagen. in: Logistics Journal. 2013 ; Jahrgang 2013.
Download
@article{dc641b62bbd442f7aa8bc2b69bb8ecd6,
title = "Ans{\"a}tze zur Ermittlung und Reduktion nichtproduktiver Zeiten an Tiefbohranlagen",
abstract = "Because of the high drilling costs an economic power production of deep geothermal energy is currently elusive. Since the production costs of deep wells depend directly on the production time, the non-productive processes require an intensive optimization. Primarily, processes which lead to an interruption of the drilling process will be analyzed and optimized. These processes are mainly the transport of the pipes between rack and working platform as well as the connection process of the pipes. In context of this paper, approaches to redesign the processes and motion sequences for a deep drilling rig are developed and their time savings are investigated.",
keywords = "Deep geothermal energy, Drilling rig, Non-productive processes, Time saving",
author = "Florian B{\"a}r and Catalin Teodoriu and Ludger Overmeyer",
year = "2013",
doi = "10.2195/lj_Proc_baer_de_201310_01",
language = "Deutsch",
volume = "2013",

}

Download

TY - JOUR

T1 - Ansätze zur Ermittlung und Reduktion nichtproduktiver Zeiten an Tiefbohranlagen

AU - Bär, Florian

AU - Teodoriu, Catalin

AU - Overmeyer, Ludger

PY - 2013

Y1 - 2013

N2 - Because of the high drilling costs an economic power production of deep geothermal energy is currently elusive. Since the production costs of deep wells depend directly on the production time, the non-productive processes require an intensive optimization. Primarily, processes which lead to an interruption of the drilling process will be analyzed and optimized. These processes are mainly the transport of the pipes between rack and working platform as well as the connection process of the pipes. In context of this paper, approaches to redesign the processes and motion sequences for a deep drilling rig are developed and their time savings are investigated.

AB - Because of the high drilling costs an economic power production of deep geothermal energy is currently elusive. Since the production costs of deep wells depend directly on the production time, the non-productive processes require an intensive optimization. Primarily, processes which lead to an interruption of the drilling process will be analyzed and optimized. These processes are mainly the transport of the pipes between rack and working platform as well as the connection process of the pipes. In context of this paper, approaches to redesign the processes and motion sequences for a deep drilling rig are developed and their time savings are investigated.

KW - Deep geothermal energy

KW - Drilling rig

KW - Non-productive processes

KW - Time saving

UR - http://www.scopus.com/inward/record.url?scp=84886010987&partnerID=8YFLogxK

U2 - 10.2195/lj_Proc_baer_de_201310_01

DO - 10.2195/lj_Proc_baer_de_201310_01

M3 - Artikel

AN - SCOPUS:84886010987

VL - 2013

JO - Logistics Journal

JF - Logistics Journal

SN - 1860-7977

ER -