Abstract
In this publication, the authors present methodology and example results for the analysis of ancillary services of an offshore wind farm cluster and its electrical power system. Thereby the operation tool Wind Cluster Management System (WCMS) is used as simulation tool to evaluate certain planning scenarios. Emphasis is made on two topics: 1) the integration of high voltage direct current (HVDC) technology to the WCMS, 2) the ancillary service analysis. As examples, voltage source converter based HVDC (VSC-HVDC) and the provision of reserve respectively balancing power are discussed in detail. The analyzed study case considers the Kriegers Flak area while the associated power system connects wind farms to Sweden, Denmark and Germany.
ASJC Scopus Sachgebiete
- Energie (insg.)
- Allgemeine Energie
Zitieren
- Standard
- Harvard
- Apa
- Vancouver
- BibTex
- RIS
in: Energy Procedia, Jahrgang 53, Nr. C, 2014, S. 114-123.
Publikation: Beitrag in Fachzeitschrift › Konferenzaufsatz in Fachzeitschrift › Forschung › Peer-Review
}
TY - JOUR
T1 - Ancillary services analysis of an offshore wind farm cluster--technical integration steps of a simulation tool
AU - Hennig, Tobias
AU - Löwer, Lothar
AU - Faiella, Luis Mariano
AU - Stock, Sebastian
AU - Jansen, Malte
AU - Hofmann, Lutz
AU - Rohrig, Kurt
N1 - Funding information: The research leading to these results has received funding from the European Union Seventh Framwork Programme (EERA DTOC project FP7-ENERGY-2011-1/ n°282797).
PY - 2014
Y1 - 2014
N2 - In this publication, the authors present methodology and example results for the analysis of ancillary services of an offshore wind farm cluster and its electrical power system. Thereby the operation tool Wind Cluster Management System (WCMS) is used as simulation tool to evaluate certain planning scenarios. Emphasis is made on two topics: 1) the integration of high voltage direct current (HVDC) technology to the WCMS, 2) the ancillary service analysis. As examples, voltage source converter based HVDC (VSC-HVDC) and the provision of reserve respectively balancing power are discussed in detail. The analyzed study case considers the Kriegers Flak area while the associated power system connects wind farms to Sweden, Denmark and Germany.
AB - In this publication, the authors present methodology and example results for the analysis of ancillary services of an offshore wind farm cluster and its electrical power system. Thereby the operation tool Wind Cluster Management System (WCMS) is used as simulation tool to evaluate certain planning scenarios. Emphasis is made on two topics: 1) the integration of high voltage direct current (HVDC) technology to the WCMS, 2) the ancillary service analysis. As examples, voltage source converter based HVDC (VSC-HVDC) and the provision of reserve respectively balancing power are discussed in detail. The analyzed study case considers the Kriegers Flak area while the associated power system connects wind farms to Sweden, Denmark and Germany.
KW - Ancillary services
KW - Cluster control, reserve, balancing power
KW - EERA-DTOC
KW - HVDC technology
KW - Offshore wind farms
UR - http://www.scopus.com/inward/record.url?scp=84923083302&partnerID=8YFLogxK
U2 - 10.1016/j.egypro.2014.07.220
DO - 10.1016/j.egypro.2014.07.220
M3 - Conference article
VL - 53
SP - 114
EP - 123
JO - Energy Procedia
JF - Energy Procedia
IS - C
ER -