A holistic two-stage decision-making methodology for passive and active building design strategies under uncertainty

Publikation: Beitrag in FachzeitschriftArtikelForschungPeer-Review

Autoren

  • Chujun Zong
  • Xia Chen
  • Fatma Deghim
  • Johannes Staudt
  • Philipp Geyer
  • Werner Lang

Organisationseinheiten

Externe Organisationen

  • Technische Universität München (TUM)
Forschungs-netzwerk anzeigen

Details

OriginalspracheEnglisch
Aufsatznummer111211
FachzeitschriftBuilding and environment
Jahrgang251
Frühes Online-Datum13 Jan. 2024
PublikationsstatusVeröffentlicht - 1 März 2024

Abstract

In the last decade, many studies focused on finding optimal design solutions considering trade-offs between different aspects of building design. Accordingly, multi-objective optimization (MOO) approaches have been increasingly applied in the building industry. However, certain aspects must be deepened to ensure a more effective decision-making process in the early planning phase. On the one hand, uncertainties should be considered before making decisions to ensure the robustness of the optimal solutions; on the other hand, decisions are made at different times in building planning, and the sequential order of making decisions should be modeled. This paper presents a holistic two-stage multi-objective stochastic optimization (MOSO)-II framework to minimize the environmental impact of global warming potential (GWP) and cost throughout the entire life cycle of a building (phases of A1-A3, B4, B6 and C3-C4), considering passive and active design strategies in two consecutive stages, under uncertainty. Herein, individual/use and political/market uncertainties are considered. As a proof of concept, the proposed framework is applied in a case study for a generic zone in a multi-family terraced residential building type with solid brick construction. The advantages of the proposed framework are validated by comparing it with alternative single-stage MOSO frameworks. Results show that the proposed two-stage MOSO-II framework can deliver a smaller range of solutions with a better performance in terms of lower GWP and cost. It indicates that the proposed framework can effectively assist planners in decision-making by reducing the effort in choosing the proper solution. Secondly, the results also emphasize the importance of passive design strategies in sustainable building planning. In addition, the energy mix structure and cost of energy sources should be carefully adjusted in the future to promote a more ecologically sustainable building design.

ASJC Scopus Sachgebiete

Ziele für nachhaltige Entwicklung

Zitieren

A holistic two-stage decision-making methodology for passive and active building design strategies under uncertainty. / Zong, Chujun; Chen, Xia; Deghim, Fatma et al.
in: Building and environment, Jahrgang 251, 111211, 01.03.2024.

Publikation: Beitrag in FachzeitschriftArtikelForschungPeer-Review

Zong C, Chen X, Deghim F, Staudt J, Geyer P, Lang W. A holistic two-stage decision-making methodology for passive and active building design strategies under uncertainty. Building and environment. 2024 Mär 1;251:111211. Epub 2024 Jan 13. doi: 10.1016/j.buildenv.2024.111211
Download
@article{297ab85297884d79adb16f3bf51e2f96,
title = "A holistic two-stage decision-making methodology for passive and active building design strategies under uncertainty",
abstract = "In the last decade, many studies focused on finding optimal design solutions considering trade-offs between different aspects of building design. Accordingly, multi-objective optimization (MOO) approaches have been increasingly applied in the building industry. However, certain aspects must be deepened to ensure a more effective decision-making process in the early planning phase. On the one hand, uncertainties should be considered before making decisions to ensure the robustness of the optimal solutions; on the other hand, decisions are made at different times in building planning, and the sequential order of making decisions should be modeled. This paper presents a holistic two-stage multi-objective stochastic optimization (MOSO)-II framework to minimize the environmental impact of global warming potential (GWP) and cost throughout the entire life cycle of a building (phases of A1-A3, B4, B6 and C3-C4), considering passive and active design strategies in two consecutive stages, under uncertainty. Herein, individual/use and political/market uncertainties are considered. As a proof of concept, the proposed framework is applied in a case study for a generic zone in a multi-family terraced residential building type with solid brick construction. The advantages of the proposed framework are validated by comparing it with alternative single-stage MOSO frameworks. Results show that the proposed two-stage MOSO-II framework can deliver a smaller range of solutions with a better performance in terms of lower GWP and cost. It indicates that the proposed framework can effectively assist planners in decision-making by reducing the effort in choosing the proper solution. Secondly, the results also emphasize the importance of passive design strategies in sustainable building planning. In addition, the energy mix structure and cost of energy sources should be carefully adjusted in the future to promote a more ecologically sustainable building design.",
keywords = "Decision-making, Life cycle assessment, Machine learning, Multi-objective optimization, Passive design, Two-stage stochastic programming, Uncertainty",
author = "Chujun Zong and Xia Chen and Fatma Deghim and Johannes Staudt and Philipp Geyer and Werner Lang",
note = "Funding Information: This research was funded by the Deutsche Forschungsgemeinschaft (German Research Foundation, DFG) under grant FOR2363 —project number: 271444440 . The authors thank the reviewers for their valuable suggestions which helped to improve the quality of this paper. ",
year = "2024",
month = mar,
day = "1",
doi = "10.1016/j.buildenv.2024.111211",
language = "English",
volume = "251",
journal = "Building and environment",
issn = "0360-1323",
publisher = "Elsevier BV",

}

Download

TY - JOUR

T1 - A holistic two-stage decision-making methodology for passive and active building design strategies under uncertainty

AU - Zong, Chujun

AU - Chen, Xia

AU - Deghim, Fatma

AU - Staudt, Johannes

AU - Geyer, Philipp

AU - Lang, Werner

N1 - Funding Information: This research was funded by the Deutsche Forschungsgemeinschaft (German Research Foundation, DFG) under grant FOR2363 —project number: 271444440 . The authors thank the reviewers for their valuable suggestions which helped to improve the quality of this paper.

PY - 2024/3/1

Y1 - 2024/3/1

N2 - In the last decade, many studies focused on finding optimal design solutions considering trade-offs between different aspects of building design. Accordingly, multi-objective optimization (MOO) approaches have been increasingly applied in the building industry. However, certain aspects must be deepened to ensure a more effective decision-making process in the early planning phase. On the one hand, uncertainties should be considered before making decisions to ensure the robustness of the optimal solutions; on the other hand, decisions are made at different times in building planning, and the sequential order of making decisions should be modeled. This paper presents a holistic two-stage multi-objective stochastic optimization (MOSO)-II framework to minimize the environmental impact of global warming potential (GWP) and cost throughout the entire life cycle of a building (phases of A1-A3, B4, B6 and C3-C4), considering passive and active design strategies in two consecutive stages, under uncertainty. Herein, individual/use and political/market uncertainties are considered. As a proof of concept, the proposed framework is applied in a case study for a generic zone in a multi-family terraced residential building type with solid brick construction. The advantages of the proposed framework are validated by comparing it with alternative single-stage MOSO frameworks. Results show that the proposed two-stage MOSO-II framework can deliver a smaller range of solutions with a better performance in terms of lower GWP and cost. It indicates that the proposed framework can effectively assist planners in decision-making by reducing the effort in choosing the proper solution. Secondly, the results also emphasize the importance of passive design strategies in sustainable building planning. In addition, the energy mix structure and cost of energy sources should be carefully adjusted in the future to promote a more ecologically sustainable building design.

AB - In the last decade, many studies focused on finding optimal design solutions considering trade-offs between different aspects of building design. Accordingly, multi-objective optimization (MOO) approaches have been increasingly applied in the building industry. However, certain aspects must be deepened to ensure a more effective decision-making process in the early planning phase. On the one hand, uncertainties should be considered before making decisions to ensure the robustness of the optimal solutions; on the other hand, decisions are made at different times in building planning, and the sequential order of making decisions should be modeled. This paper presents a holistic two-stage multi-objective stochastic optimization (MOSO)-II framework to minimize the environmental impact of global warming potential (GWP) and cost throughout the entire life cycle of a building (phases of A1-A3, B4, B6 and C3-C4), considering passive and active design strategies in two consecutive stages, under uncertainty. Herein, individual/use and political/market uncertainties are considered. As a proof of concept, the proposed framework is applied in a case study for a generic zone in a multi-family terraced residential building type with solid brick construction. The advantages of the proposed framework are validated by comparing it with alternative single-stage MOSO frameworks. Results show that the proposed two-stage MOSO-II framework can deliver a smaller range of solutions with a better performance in terms of lower GWP and cost. It indicates that the proposed framework can effectively assist planners in decision-making by reducing the effort in choosing the proper solution. Secondly, the results also emphasize the importance of passive design strategies in sustainable building planning. In addition, the energy mix structure and cost of energy sources should be carefully adjusted in the future to promote a more ecologically sustainable building design.

KW - Decision-making

KW - Life cycle assessment

KW - Machine learning

KW - Multi-objective optimization

KW - Passive design

KW - Two-stage stochastic programming

KW - Uncertainty

UR - http://www.scopus.com/inward/record.url?scp=85183548591&partnerID=8YFLogxK

U2 - 10.1016/j.buildenv.2024.111211

DO - 10.1016/j.buildenv.2024.111211

M3 - Article

AN - SCOPUS:85183548591

VL - 251

JO - Building and environment

JF - Building and environment

SN - 0360-1323

M1 - 111211

ER -